The boring of tunnels for the proposed metro will produce an estimated 10 million tons of construction waste, equivalent to almost 1.5 million truckloads, a Times of Malta exercise has found.
The 4.9 million cubic metres of waste is five times greater that estimated for the Malta to Gozo tunnel, which is projected to produce one million cubic metres of waste if carried out. Land reclamation is one of the options to dispose of the construction waste.
The calculation is based on an estimate provided... Читать дальше...