Supply of Bonnet Carre Spillway clay used to build levees will soon run out, Corps says 0 29.08.2019 18:38 Stars and Stripes The stockpile of high-quality clay in the Bonnet Carre Spillway that’s been used to build large portions of the earthen levee system in the New Orleans area over the past 15 years will soon run out, the U.S. Army Corps of Engineers said this week. Moscow.media Частные объявления сегодня Rss.plus Все новости за 24 часа Другие проекты от SMI24.net Музыкальные новости Агрегатор новостей 24СМИ