This will be the first ever containerised cargo movement on this Inland water transport (IWT) route and the ship will carry 21 containers of petrochemicals, 20 of edible oil and others of beverage and mineral water. The Centre will further finance 80% of the estimated cost of 305.84 crore for dredging in two stretches of Bangladesh inland waterways.