Following the need for repairs on two generators at Hwange Thermal Power Station, Zesa has pushed its giant Kariba South Power Station to generate 892MW as of Tuesday, filling much of the gap between demand and supply, but load shedding will continue until the repairs on the two Hwange units, which can generate 320MW, are complete.