The Engineering Projects Department at the al-Abbas's (p) holy shrine announced the continuation of the cladding work of the floor and the wall of the shrine of Aba al-Fadl al-Abbas (peace be upon him), from the right side inward to the holy sanctuary, which is the first phase of these works, provided that the start of these works on the left side will be after this section is completed.