The scope of the MAHSR T3 Package includes Design, Supply, Construction and Testing & Commissioning track works on a Design-Build lump sum price basis for the double line high speed railway between Vadodara and Sabarmati in Gujarat. Japanese Shinkansen track technology will be adopted in this project. Upon completion, this slab track system will enable trains to travel at speeds of up to 320 KMPH.