by Andy Foster Shortly after being elected Mayor, just before Christmas 2019, I received a call telling me a major wastewater pipe had broken on Dixon Street. I promptly headed to the site to meet Wellington Water management and contractors. It was the first of several well reported pipe failures in rapid succession. Some were […]