Deepening of Meenachil river resumes amid protests by eco activists, residents
Silt deposit along 1.8-km stretch between Poovathumood and Peroor will be removed to ease water flow

Silt deposit along 1.8-km stretch between Poovathumood and Peroor will be removed to ease water flow