A recent report on the Bengaluru Suburban Rail Project (BSRP) identifies 650 structures for demolition. Corridor-2 is most affected with 289 structures, followed by Corridor-4 (140 structures), Corridor-3 (135 structures), and Corridor-1 (85 structures). The project includes land acquisition of 233 hectares and construction of 69 stations and two rail depots.