Work of assembling prefabricated bowstring steel bridge over railway line begins at Indrali in Udupi
Being executed by NH Division of PWD, the RoB is part of widening NH 169A to four lanes between Udupi and Manipal
Being executed by NH Division of PWD, the RoB is part of widening NH 169A to four lanes between Udupi and Manipal