Добавить новость
ru24.net
News in English
Октябрь
2024

Van Oord Cable-laying Vessel Calypso Makes Debut & is Now Fully Operational

0

[By: Van Oord]

Van Oord’s brand new cable-laying vessel Calypso has made its official debut by installing cables on its first offshore wind project. After the Nexus, the Calypso is Van Oord’s second cable-laying vessel. Custom-built and featuring the latest sustainable technologies, the vessel is a key strategic addition to Van Oord’s offshore wind fleet. The Calypso’s first project is RWE’s prestigious Sofia Offshore Wind Farm in the UK, one of the largest offshore wind projects in the world. 

By investing in state-of-the-art equipment like the Calypso, Van Oord is anticipating an increase in scale in the offshore wind industry and contributing to the energy transition. The Calypso is purpose-built to install inter-array grid and export cables for offshore wind projects worldwide, including high-voltage direct current (HVDC) cables. Van Oord’s highly innovative cable trenchers can also be operated from the vessel.  

The Calypso is equipped with not just one, but two cable carousels, one on deck and another below deck, providing a total cable-carrying capacity of 8,000 tonnes and capable of laying two HVDC cables simultaneously. The vessel’s design incorporates the latest sustainable technologies to reduce its carbon footprint. Apart from the ability to run on biofuel, this hybrid vessel has future-ready engines with built-in flexibility to anticipate e-fuels. It has a large battery pack, a shore supply connection, and a state-of-the-art energy management system.  

Arnoud Kuis, Managing Director Offshore Energy: ‘With the Calypso now operational, we have significantly strengthened our cable installation fleet. This milestone reflects our commitment to continuously reinforcing our leading position in the market by investing in sustainable technology. With two cable installation vessels at our disposal, along with our extensive experience and expertise, we have the resources and flexibility needed to provide value to our clients and excel in this dynamic industry. It’s exciting to see the Calypso in action, installing its first cables on the Sofia project, and we look forward to its successful deployment on many more offshore wind projects.




Moscow.media
Частные объявления сегодня





Rss.plus




Спорт в России и мире

Новости спорта


Новости тенниса
WTA

Кудерметова проиграла Стирнс на старте турнира WTA в Брисбене






Eni успешно начала добычу нефти и газа на 2-й фазе месторождения Baleine

Футбольный фестиваль «Красно-белый Новый Год» прошел в Люберцах

Скончалась известная по сериалу «Кухня» актриса Надежда Подъяпольская

Шрам на сердце: дочь Заворотнюк откровенно высказалась о смерти матери