Chennai Metro Rail completes nearly 70% of station work between Poonamallee and Porur 0 09.01.2025 15:15 The Hindu The 118.9-km phase II project designed with three corridors — Madhavaram to SIPCOT (corridor 3), Light House to Poonamallee (corridor 4), and Madhavaram to Sholinganallur (corridor 5) — will open in various stages Moscow.media Частные объявления сегодня Rss.plus Все новости за 24 часа