EVANSVILLE, Ind. — The city of Evansville is delaying emergency demolition of two fire-damaged buildings downtown because of a lack of funds. The Evansville Courier & Press reports (http://bit.ly/29vz4G2 ) that an engineer’s report last month determined both buildings need to be demolished. But the $300,000 cost is more than the Evansville-Vanderburgh Building Commission has