Tunnelling under the Adyar begins as part of Metro Rail’s phase II project
While the riverbed ranges in depth from 3 m to 5 m, the track will be laid at a depth of about 18 m
While the riverbed ranges in depth from 3 m to 5 m, the track will be laid at a depth of about 18 m